Selçuk Aker · Freelance & Collaboration

Content Management: Establishing a Publication and Approval Scheme with a Freelance Graphic Designer

Content management is more than just writing dates on the sharing calendar. Preparation, verification, design, approval and keeping of information up to date are planned together. If these steps are not clear when working with a freelance graphic designer, the publication may be delayed even if the design files are ready.

By Selçuk Aker · Published · 4 min read · Updated

Content Management: Establishing a Publication and Approval Scheme with a Freelance Graphic Designer — Selçuk Aker

Content management is more than just writing dates on the sharing calendar. Preparation, verification, design, approval and keeping of information up to date are planned together. If these steps are not clear when working with a freelance graphic designer, the publication may be delayed even if the design files are ready.

Identify the owner of the content

The product price must be verified by the sales team, the technical specifications by the relevant expert, and the campaign conditions by the authorized person. The designer should not fill in the missing information by guessing. The purpose for which a post is produced and who will give final approval should be included in the brief.

For example, in a business with three branches, if the opening time is different for each location, a single general visual error may occur. It is necessary to separate the common template and the branch-specific information field. In the final approval, not only the spelling but also the target location and publication date should be checked.

Separate subject, format and version

A short video, an information card and a web episode can be prepared for the same topic. These are not all the same file; There are different delivery and approval needs. Including subject, format, date and version in the file name makes it easier to keep track.

  • Draft: The content is not yet completed.
  • Fact checking: The brand evaluates accuracy.
  • Design: Approved content is transferred to the visual layout.
  • Publication approval: Checking the latest version and links.
  • On air or in archive: The version used is recorded.

Status names may vary depending on the tool the team uses. The important thing is not to guess which of the five files named “last” will be used. File delivery guide completes this scheme.

Do not replace tool selection with process

The calendar or task tool can make tasks visible; Does not resolve missing approval authority. Before choosing a management platform, determine who will have access, where comments will be collected, and how approval will be recorded. A simple layout, when used consistently, can be more useful than a complex but abandoned system.

Regular content should also include the update date. Outdated price, outdated notice or service no longer available; It may continue to carry false information along with new posts. Don't forget to check the archive only when the design changes.

Planning production with Selçuk Aker

Master templates and format adaptations can be planned within the scope of social media design. Select Monthly support and project-based work based on actual content volume. Copy writing, account management and sharing processes should be defined separately in the proposal.

Try a real update when choosing CMS on the website

A content management system is the tool for organizing and publishing web content; It does not replace the responsibility of publication. When evaluating the panel, try a real job instead of a blank screen presentation: adding a new product, changing an image, previewing the link and saving a draft. Can the person in your organization complete this job?

Not everyone may need to change every area. Separate the roles of preparing the manuscript, checking the information, and publishing. Ask about the possibility of exporting content with a fallback method when incorrect changes are made. Do not assume their existence from the sentence “including the administration panel”.

Data structure in admin panel design explains why areas should be planned together. Panel training, initial content entry and subsequent support should be written as separate submissions.

Set up blog calendar from customer questions

A corporate blog should not only be a place to publish new articles at regular intervals. Record repetitive questions, misunderstood deliverables, and preparation needs during sales calls. Assign a main question, responsible person, and relevant service link to each post. Instead of changing the date and presenting the same information as if it were updated, check the section that actually changed.

If there are two very similar drafts, compare their roles in the keyword map before opening a new URL. If a new guide completes the missing part of the old article, provide a link; If it repeats the same answer, improve the existing article. Use digital asset archive for images and license records.

Frequently asked questions

Does the content calendar mean that all content is ready?

No. The subject plan and verified text, design file and publication approval are separate situations.

Who should collect the revisions?

On the brand side, a single responsible person should clarify and communicate conflicting views. The designer should not have to solve by guessing at interpretations that invalidate each other.

Should posts appear on the same day on every channel?

It is not mandatory. The decision should be made based on the campaign purpose, the channel's mission and the production plan.

Related articles

Have a design project in mind?

Let’s agree on your requirements, deliverables and timeline. Work directly with Selçuk Aker.

Request a design proposal ↗